Dubai malls rebuild: Mall of the Emirates’ AED 5bn revamp, Dubai Mall’s 240 new stores and Dubai Square
Majid Al Futtaim is spending AED 5bn on Mall of the Emirates: about 20,000 m² and 100 new stores. Emaar is adding 240 shops and restaurants to Dubai Mall for AED 1.5bn and building Dubai Square in Creek Harbour. How malls move home values in Al Barsha, Downtown and by the creek.
While new neighbourhood malls open in the suburbs, Dubai’s two flagship malls are being rebuilt and a third large one is under construction. For the housing market this matters as much as a new metro station: in a city that is hot for half the year, the mall is the district’s high street, where people walk, work and spend their evenings. Here are the three projects and where they stand in September 2026.
Mall of the Emirates: an AED 5bn renewal
In April 2025, marking the mall’s 20th anniversary, Majid Al Futtaim announced an AED 5bn (about $1.4bn) transformation. It includes:
- around 20,000 m² of new retail space and roughly 100 new stores;
- four new entertainment concepts by late 2026 and an upgraded IMAX at Vox Cinemas;
- a cultural hub with the Dubai Performing Arts Academy;
- the mall’s first outdoor dining courtyard, due in early 2027;
- new access roads, bridge upgrades and barrier-free parking, delivered with the RTA.
For neighbouring Al Barsha the main effect is keeping its standing. An old mall that is not refreshed quickly loses visitors to new ones; the revamp keeps the district among the easiest places to live without a car, with the metro, the mall, schools and Sheikh Zayed Road close by. Our Majid Al Futtaim profile covers how the group builds homes around its malls.
Talk to a licensed broker: 📲 +971 50 120 32 64 on WhatsApp, @dubai_oleg on Telegram
Dubai Mall: 240 more shops and restaurants
In June 2024 Emaar announced an AED 1.5bn expansion of Dubai Mall adding 240 luxury retail and dining outlets. The contractor was mobilising on site at the time of the announcement, but Emaar has not published a completion date. The pressure is clear from footfall: the mall received 105 million visitors in 2023, and in high season it is simply crowded.
For owners in Downtown Dubai the expansion supports the short-let case. Visitors choose to stay near the mall and Burj Khalifa, and Emaar keeps investing in that anchor.
Dubai Square: a new mall by the creek
The third project is Dubai Square in Dubai Creek Harbour. In February 2024 Emaar said detailed design was complete. The mall will connect directly to the future Dubai Creek Tower and use AI systems to manage visitor flows and tenants. Local press reports a phased opening from 2028; Emaar has not published an official schedule. We place it among the other new openings in our note on seven new UAE malls.
How a mall affects home values
| Project | District | Effect on housing |
|---|---|---|
| Mall of the Emirates | Al Barsha | Keeps its standing and tenant demand near the metro |
| Dubai Mall | Downtown | Supports short-let and tourist demand |
| Dubai Square | Dubai Creek Harbour | Fills the district’s biggest gap, so the largest potential effect |
A mall matters most where there is not one yet. In Downtown and Al Barsha the upgrades protect existing demand. In Creek Harbour, Dubai Square would close the district’s main gap: large-scale shopping and entertainment within walking distance. But opening is at least two years away, so pay for it cautiously.
If you are weighing an established centre against a district with upside, compare prices in Downtown Dubai and Dubai Creek Harbour: the gap per square foot is, in part, the price of a mall that has not been built yet.
Video on this topic
The same subject on the English channel — each clip has a written version of its own.
8:01Island Park at Dubai Creek Harbour: an Emaar tower that is almost finished9 August 2024
11:36Ready apartments in Dubai Creek Harbour: Creek Horizon, Harbour Views, The Cove24 September 2023
5:41Vida Residence Downtown: ready apartments beside the Burj14 June 2024
8:54Address Sky View: the twin towers with the bridge, reviewed properly31 May 2024
3:26Il Primo penthouses: the top of the Downtown market16 May 2024
13:08Two-bedroom apartments in Mina Rashid: reading the layouts properly10 October 2023
In the news
Other write-ups on the site about the same thing.
Emaar’s AED 200bn masterplan for 150,000 residents: what buyers know so far
Emaar has announced its largest masterplan ever: AED 200bn, 4.5 million m² of floor area, about 150,000 residents, five zones and a promised metro link. The name and site are still not official. Separately, it bought land in Ras Al Khor for AED 2.9bn. What it means for buyers.
Majid Al Futtaim: a retail group that builds communities around its own malls
The owner of Mall of the Emirates and a large regional retail business, with a property arm building master-planned communities. What an anchor tenant that owns itself changes for a resident.
Elysian Mansions, Tilal Al Ghaf: Dubai lagoon mansions three years after launch
Elysian Mansions is a gated enclave of 94 five- and six-bedroom mansions on the Tilal Al Ghaf lagoon by Majid Al Futtaim. Launched in 2023 from about AED 18.5m, resale listings now run from AED 22m to 55m, and handover has slipped from late 2025 to late 2026.
Dubai Creek Tower has been redesigned: what it means for Creek Harbour
The tower the whole master plan was built around went through a design competition and a new concept. Why a landmark matters to a district’s prices, and at what point in construction the market starts pricing it in.
Al Ali Property Investment: check the plot is freehold before anything else
A developer with projects in Al Barsha and Nad Al Sheba. Mainland Dubai is not uniformly open to foreign ownership, and the map of what is does not follow district boundaries.
Dubai Loop: Elon Musk’s tunnel between DIFC and Dubai Mall — what is really being built
The Boring Company’s Dubai Loop: a 6.4 km pilot with 4 stations between DIFC and Dubai Mall for about $154m, a full 22.5 km, 19-station network for about $545m. The RTA contract was signed in February 2026 and tunnelling is due in the second half of the year. What it means for buyers downtown.





