Skip to content

Sell your apartment in Dubai

Leave your name and phone number — I will get back to you to discuss price and timing.

How I sell apartments →
Oleg Svyatenko, RERA-registered real estate broker in Dubai
Service

Furnishing an apartment in Dubai

No. 1 for apartment furnishing in Dubai for English-speaking investors and owners: after handover the flat is fitted out in full — furniture, appliances, textiles, tableware, decor — for letting or for living. A package from a UAE warehouse is assembled in 1–3 days, buying from local stores takes 1–3 weeks, made-to-order imports up to 3 months.

Furnish your apartment

Name and number — we will ask about the layout, the letting format and the handover date.

Most new apartments in Dubai are handed over as a shell with a kitchen: everything else — from the bed to the kettle — is the owner’s job. Time between the keys and the first tenant is pure loss: service charges are running and income has not started.

The work is led by an invited furnishing specialist — an independent practitioner, not our employee. We choose the expert for your building and letting format, introduce you and stay in touch until the handover and the listing shoot. You need not be there: it runs under power of attorney with photo reports.

In depth

Home staging in Dubai: how much it adds to the rent and the sale price

Home staging in Dubai adds 10-30% to rent and 5-10% to a sale price. A Damac Hills case: USD 10,000 of furniture lifted rent from 19,000 to 25,000.

Read the full article →

What we cover

What is apartment furnishing in Dubai and why does it matter?

It means supplying everything the developer does not: large furniture, appliances, lighting, textiles, tableware and decor. For a flat bought to let it is the first project after the keys.

Gross rental yields in Dubai usually sit at 5–8% a year before costs, and every extra week of vacancy eats into that. Furnishing is a line in the financial model, not a shopping trip.

Three ways to furnish

There are 3 routes: a ready package, buying from local stores, and made-to-order pieces. They differ in lead time, budget and how individual the result is.

A turnkey package

A ready design set for a standard layout — studio, 1 or 2 bedrooms — from a UAE warehouse. The fastest route and the industry standard for rental units. The price of speed is a moderate mark-up and little individuality.

Buying from stores

A base from local chains and showrooms, in-stock items only. Usually cheaper, but delivery slots must fit the building’s rules. Using 2–3 stores is quicker than chasing the ideal across 10 addresses.

Made to order

Custom sofas, joinery and pieces from European catalogues. Production and sea freight take from 6 weeks to 3 months. Worth it for your own home and premium properties; custom accents can arrive later without interrupting the tenancy.

How long does it take to furnish an apartment in Dubai?

Anywhere from 3 days to 3 months, depending on the route. With a package the assembly takes 1–3 days and the full cycle from contract runs from a few days to a couple of weeks.

Buying in-stock items yourself realistically takes 1–3 weeks: large furniture arrives within a couple of days to a week per store, plus assembly. Made-to-order pieces from abroad stretch the job into months.

What level of furniture suits the building?

The level should match the segment of the building and the district. A designer interior in a budget tower will not lift the rent to premium, and cheap furniture in an expensive building devalues the flat by more than the sum saved.

There are 3 levels. Economy, from mass-market chains, covers annual lets in residential districts. Mid-range adds showroom accents to a chain-store base — the standard for short lets in tourist locations. Premium means custom and branded pieces for penthouses and villas.

When does furnishing pay back, and when does it not?

It pays back in 4 cases: holiday lets, studios and other small flats, corporate lets and districts with high tenant turnover. It rarely pays in larger family flats, where tenants bring their own furniture and stay for years.

Do the sum before buying. Compare live listings with and without furniture for the same size in your building: the gap in rent is the entire return. Divide the budget by that annual premium and allow for replacement — rental furniture in a hot climate lasts a few years, not a decade.

What usually breaks the timeline

Not the furniture but the logistics: an unbooked service lift, power that is not connected and deliveries that do not line up. Many towers only allow deliveries by appointment, on weekdays, through the service lift against a deposit.

Power and water in your name, internet and gas take from 1 day to several to set up, and assembly cannot start without them. A new-build needs 2 cleans — before furnishing and after assembly; each takes a day.

How the work runs

The work runs in 5 steps and starts before the keys: the furnishing contract can be signed ahead of handover, with installation booked for the first days after it.

  1. 1

    Format and level

    A short let needs the full set down to tableware and linen; for an annual contract basic furniture and appliances are often enough.

  2. 2

    Measurements and contents

    The expert measures the rooms, door openings and the lift: wrong dimensions are the most common reason for returns. The item list is agreed with you on photos.

  3. 3

    Utilities and the lift

    In parallel the utility connections are set up and a service-lift slot is booked under the building’s rules.

  4. 4

    Delivery and assembly

    The furniture is delivered and assembled, followed by the final clean. Invoices and warranty cards are kept for insurance and wear-and-tear disputes.

  5. 5

    Handover and the shoot

    The flat is accepted with a photo report, the shoot is booked for the day after the clean and the listing goes live immediately.

Who does the work?

Furnishing is led by an invited fit-out expert — an independent practitioner, not a member of our staff. We pick the expert for your property, introduce you and stay the single point of contact, so deliveries from several suppliers do not drag on for weeks.

Request

Furnish your apartment

Name and number — we will ask about the layout, the letting format and the handover date.

Furnish your apartment

Frequently asked questions

Does a flat on an annual contract need furniture?

Not always. Central districts let furnished flats faster and at higher rents, while in family communities tenants often want an empty flat for their own things. For short lets full furnishing is mandatory.

Which is better value: a turnkey package or buying it yourself?

Buying yourself is usually cheaper; the package wins on time and predictability. For an investor who does not live in Dubai the package is almost always the rational choice.

Can furnishing be done remotely, without flying to Dubai?

Yes, it is common practice. The contents are agreed on photos, the work runs under power of attorney and the flat is handed over with a photo report.

Should an empty flat be furnished before it is sold?

Preferably. Empty rooms look smaller and colder in photographs, and renting a neutral set of furniture and decor for the marketing period helps. Virtual staging costs less, but at a viewing an empty flat loses to a furnished one.

See also

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram