Skip to content

Sell your apartment in Dubai

Leave your name and phone number — I will get back to you to discuss price and timing.

How I sell apartments →
Oleg Svyatenko, RERA-registered real estate broker in Dubai
Service

Interior design in Dubai

No. 1 for interior design in Dubai for English-speaking owners and investors: a developer-finish apartment or villa is turned into an interior built for living or for letting — concept, working drawings, materials, furniture, site supervision. The project runs in 4 stages and stays within what the building will approve: a management-company NOC and a municipality permit.

Discuss your interior

Name and number — tell us about the property and the goal, and we will come back with how we would work.

A developer apartment in Dubai is a production run: hundreds of identical units in one tower built to a single specification. A flat at USD 300 thousand and one at a million can come with much the same finish — the real step up starts only in premium and branded residences.

The project is led by an invited interior designer or design studio — an independent practitioner, not on our staff. We select the expert for the property and the brief, introduce you and stay in touch through to the final styling. The key rule: the interior has to match the segment of the building and district.

In depth

Interior design in Dubai: neuroarchitecture, longevity design and soulful luxury explained

Interior design in Dubai: neuroarchitecture, longevity rooms for villas, a 600 sq m study in a Dubai Marina penthouse and a 2-3 month turnkey project.

Read the full article →

What does an interior design project in Dubai include?

A project has 4 stages: brief and budget, concept, working drawings, then procurement with site supervision.

  1. 1

    Brief and budget

    Living or letting, family or tenant profile, what stays from the developer and what changes.

  2. 2

    Concept

    Layout, style, palette, lighting scenarios and visualisations of the key rooms.

  3. 3

    Working drawings

    Drawings for the contractor and specifications for materials, lighting and furniture — within what the building will approve.

  4. 4

    Procurement and supervision

    Purchasing and delivery control, site supervision through to the final styling.

Why is a developer finish no substitute for a design project?

Because the developer is solving a different problem: delivering predictable, repairable, identical quality across hundreds of flats and meeting the handover date. Hence porcelain instead of natural stone, painted MDF instead of veneer and a basic run of light fittings with no scenes.

Nor does the price of a flat reflect its finish: most of the value comes from location, view, the building and the developer’s name. After demanding buyers arrived in 2022–2023, layouts and kitchens improved, but the standard is still designed around a tenant.

What sets the tone in premium interiors

3 approaches set the tone: neuroarchitecture, longevity design and soulful luxury. They took hold after the pandemic, when the home became a place to work, rest and recover at once.

Neuroarchitecture

How form, light, sound, colour and materials affect the nervous system: space that lowers stress and improves sleep. With Dubai’s harsh sun, working with light, shade and the orientation of the bedroom is a measurable advantage.

Longevity design

Interiors for health: air filtration and low-VOC materials, circadian lighting, wellness areas, ergonomics, acoustics and a connection to nature.

Soulful luxury

A move away from cold gloss to interiors with character: natural materials, designer furniture, art and tactility instead of conspicuous expense.

Which materials are designers in Dubai choosing in 2026?

Designers are moving from polished marble to travertine, onyx, quartzite and semi-precious minerals, and in 2026 amethyst is increasingly named in premium projects. High polish is giving way to matt, brushed and leathered finishes.

The working formula is a neutral base plus 1–2 expressive stone accents: a backlit onyx wall, an agate or rose quartz panel, a fluorite table.

The climate adds its own rules: air conditioning dries out timber, sun at floor-to-ceiling windows fades fabric and lacquer, and ultraviolet weakens the colour of amethyst and rose quartz. Materials are chosen for how they will look after 5 years here, and stone is kept out of direct sun.

What has to be approved before work starts in a flat?

Anything beyond cosmetic work needs an NOC — written permission from the building’s management company. Changes to layout, building services, electrics or plumbing also need a municipality permit, and only a contractor with a valid licence and insurance may carry them out.

No complex approvals are needed for new lighting, wall panels and paint, replacing taps at existing points, your own kitchen appliances, made-to-measure furniture, textiles and curtains.

Does interior design pay off in a rental property?

Partly: a good interior lifts the rent and shortens the time on the market, but not by multiples. A tenant in Dubai pays first for address, size, view and the quality of the building, so a full magazine-style refit of a rental unit rarely pays for itself.

5 targeted upgrades work fastest: a lighting scheme, built-in storage, kitchen appliances, curtains with textiles and made-to-measure furniture. Lighting is the cheapest and most visible.

One branded example is Jasmine Lane in Jumeirah Golf Estates: 138 townhouses of 2,200–2,330 sq ft with interiors by Elie Saab. Launch prices started at AED 3.68 million; after handover in summer 2024 the cheapest house in our database is AED 5.95 million. The main price driver there is the district itself, not the name on the facade.

How to brief a designer

Describe scenarios rather than a style: where you work, how you sleep, what bothers you in your current home. Ask for decisions to be justified by their effect on wellbeing, not only by the look of the references.

Who leads the work?

The work is led by an invited interior designer or design studio — an independent practitioner, not a member of our team. We choose them for the property, the building’s segment and the goal, introduce you and stay in touch through all 4 stages.

Request

Discuss your interior

Name and number — tell us about the property and the goal, and we will come back with how we would work.

Discuss your interior

Frequently asked questions

Can a design project in Dubai be run remotely?

Yes. Concept and specifications are agreed online, a licensed contractor and site supervision work on the ground, and reports come as photos.

Does it matter whether the flat is let short-term or annually?

It does. For short lets design almost always pays: the interior converts directly into nightly rate and occupancy. For annual lets it pays only if the level matches the building’s segment.

Can I buy a flat without a finish and design everything myself?

In mass-market new builds in Dubai, almost never: developers hand units over ready to move into. Full layout freedom exists in villas, townhouses and projects delivered as shell and core.

Do I need permission to repaint the walls?

Painting and replacing decorative elements usually need no permit, though the management company may ask for a notice and a service-lift booking. Anything that touches water, electrics or walls must be approved.

See also

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram