No. 1 for apartment and villa renovation in Dubai for English-speaking owners and investors: NOC approvals before the start, a licensed contractor, payments against verifiable stages and a snag list at handover. Local practice leaves the final 10–15% of the contract sum until completion and holds 5–10% as retention, giving both sides leverage without a row.

Request a renovation

Name and number — we will ask about the property, the scope and the timeline.

A renovation in Dubai starts with approvals, not with the crew: consent from the developer or management company, an authority permit for serious work, and the building’s own rules. So the date in the quote and the real date differ, and stone and custom joinery take 8–16 weeks to arrive.

The work is carried out by an invited contractor — an independent licensed company, not our staff. We choose the contractor for your property and community, introduce you, and stay involved until the handover certificate is signed.

In depth

Villa restoration in Dubai: what marble, wood and furniture repair costs in luxury homes

Villa restoration in Dubai: a 1 cm scratch for AED 3,500, a Palm Jumeirah marble job for AED 200,000 instead of 800,000, and what cannot be restored.

Read the full article →

What we cover

Do you need a permit to renovate a flat in Dubai?

Yes. Two approvals stand between an owner and a removed wall: a no-objection certificate (NOC) from the building’s management company and the regulator’s permit. Both are easier to obtain before work starts than afterwards.

Which regulator depends on the community’s master developer: usually the municipality, sometimes a free-zone authority. Its approval covers structural work, wet areas, the facade, electrics, water and cooling.

Which works cannot be done without approval?

Load-bearing walls, columns and slabs are off limits, as are facade glazing, risers, ventilation and the central air-conditioning layout. Moving a bathroom or kitchen without approved waterproofing is the commonest source of claims from neighbours below.

Cosmetic work needs no complex approvals: new lighting, paint, taps and sanitaryware at existing points, kitchen appliances, made-to-measure furniture, curtains.

Why do renovations in Dubai overrun?

Because approvals sit between signing the contract and starting on site, and then community rules, climate and deliveries take over. A villa or large apartment is a project of six months to three years.

Noise hours, lift bookings and worker passes eat weeks, summer brings a midday break on outdoor work, and made-to-order items take 8–16 weeks. The main factor, though, is changes along the way: two of three months of delay often come from the client’s own decisions.

A contract that keeps the job on time

The standard schedule is an advance, stage payments and a final 10–15% of the contract sum. Disputes start wherever a stage is described vaguely, so four things belong in the contract.

Verifiable stages

Not “rough works” but specific items that can be inspected and ticked off.

Payment terms

For example, 5 working days after a stage is signed off — otherwise payments hang for weeks.

Penalties both ways

The contractor pays for missed dates, the client for late payment. Without a penalty a deadline is only a wish.

Retention

5–10% stays with the client for the warranty period, usually six to twelve months after handover.

How the work runs

The work runs in five steps, from the building rules to a signed handover certificate. For small jobs of 3–7 days a temporary permit is enough: it usually takes a day or two, though some communities want the application 48 hours ahead.

  1. 1

    Rules and permits

    We get the building rules in writing: working hours, contractor requirements, lift bookings, and the authority that approves your address.

  2. 2

    Contractor and contract

    We check the licence, the right to do this type of work and experience with approvals in your community. Stages, penalties and warranty go into the contract.

  3. 3

    Access application

    The crew list with Emirates IDs or passports, vehicles, the contractor’s trade licence, a description of the works, waste removal.

  4. 4

    Works and variations

    Any departure from the design becomes a written variation with a new price and date.

  5. 5

    Handover

    A walk-through against a checklist, a snag list with photographs and the certificate. Approvals stay with the title documents.

Why do you need a snag list at handover?

A snag list sets the point at which remarks close. It is a written record of defects: room, description, photo, date and a deadline for fixing, usually 10–15 working days. Both parties sign; later finds go under the warranty.

Unfinished items are priced in money: with defects worth three thousand dirhams, withholding a hundred thousand is pressure, not protection. A workable final settlement is 60% on handing over the keys and 40% once the list is closed.

Who does the work?

The renovation is done by an invited contractor with a valid licence and insurance — an independent practitioner, not our employee. A Dubai building will not admit an unlicensed crew.

Our role is the third party between client and construction company. Clients often live outside Dubai and judge the work by video, which shows neither floor levels nor joints nor ventilation. So we go to the site.

When does a renovation pay back, and when not?

For your own home the spend is justified by comfort. In a rental flat a full refit rarely pays back: the tenant pays for address, size, view and the building. Lighting, storage, appliances and curtains do.

Vacancy counts too: two weeks without a tenant at a rent of AED 120–150 thousand a year is a loss of AED 5–6 thousand. So the gap between tenants is for cosmetic work, and major works wait until the property is empty.

For a villa bought to resell, add the Dubai Land Department fee of 4%, an agent’s commission of about 2% and holding costs over 4–9 months of works.

Request

Request a renovation

Name and number — we will ask about the property, the scope and the timeline.

Request a renovation

Frequently asked questions

How long does a renovation in Dubai take?

Small jobs — local repainting, new ironmongery, restoring worktops — take 3–7 days. Longer projects run two to three months; a villa takes six months to three years.

Can I withhold the final 10–15% if the contractor missed the deadline?

No. A missed date is compensated by the penalty written into the contract, not by withholding the whole sum. Court in the UAE means months and a fee set as a percentage of the claim.

Is it better to replace damaged stone or restore it?

If the same article and batch is available in the UAE, replace it. If the batch has run out, delivery takes three to four months or the slab is book-matched, restoration wins: one or two days, no demolition, no approvals.

Why are developer finishes in Dubai so plain?

One tower can hold from six hundred to over a thousand flats, all built to a single specification designed for tenants. An individual level of finish is a separate renovation for your project.