Layouts and the handover date come from the sales-launch announcement; the date
of that announcement is shown next to the prices. It is what the developer
claimed at launch, not a registry record — off-plan, phasing and dates get
revised. I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
1 bedroom
from AED 4 300 000 961–1 446 sqftas of 20 November 2026
2 bedrooms
from AED 7 000 000 1 469–2 120 sqftas of 20 November 2026
3 bedrooms
from AED 11 000 000 2 005–4 741 sqftas of 20 November 2026
Handover
Q4 2030
Developer
Avenew Development
Figures come from the developer's own materials sent to brokers, dated 20 November 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
Located in Dubai Islands. Developer — Avenew Development.
About the project
The St. Regis Residences Dubai Islands is a residential complex of several buildings in Dubai Islands, handover is due Q4 2030.
The developer is Avenew Development.
The complex holds 248 apartments in total. Layouts, according to the sales-launch announcement — 1, 2, 3, 4 and 5 bedrooms.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Dubai Islands.
The final payment on this building falls in 2030 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
Frequently asked about The St. Regis Residences Dubai Islands
Who is the developer of The St. Regis Residences Dubai Islands?
Avenew Development.
When is The St. Regis Residences Dubai Islands handed over?
The sales-launch announcement says Q4 2030. The date in the contract for a particular unit can differ — I check it before the deal.
What layouts are there in The St. Regis Residences Dubai Islands?
1-bedroom, 2-bedroom, 3-bedroom, 4-bedroom and 5-bedroom, according to the sales-launch announcement. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Where is The St. Regis Residences Dubai Islands?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in The St. Regis Residences Dubai Islands cost?
There are no open listings for this building in the database right now. I will check the price for a particular layout against the closed databases and send it with the deal costs worked out.
SHIONE is Beyond’s second residential project in the SIORA master plan on Dubai Islands: two towers, 603 residences, AED 3bn in value. One-bedroom units launched from about AED 2.7m on a 50/50 payment plan, with handover expected in 2030.
Eight UAE megaprojects and what each means for property: Al Maktoum airport at 260m passengers, the 900 km Etihad Rail, Palm Jebel Ali with 90 km of coast, the Metro Blue Line, Dubai Islands, the $5.7bn Wynn resort, Saadiyat’s museums and Yas Island.
Nakheel has released Bay Estate, the first community on Island E of Dubai Islands: 357 townhouses and villas plus 60 plots around two swimmable lagoons. A three-bedroom townhouse averages AED 5.9m; handover is estimated for January 2031.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.