Photos and renders of the building and grounds — not of this particular unit.
1 / 14
Layouts and the handover date come from the sales-launch announcement; the date
of that announcement is shown next to the prices. It is what the developer
claimed at launch, not a registry record — off-plan, phasing and dates get
revised. I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
2 bedrooms — unit 1311
from AED 2 647 000 1 035 sqftas of 15 October 2026
2 bedrooms — unit 504
from AED 2 894 000 1 008 sqftas of 15 October 2026
Layout sizes from the same materials
3 bedrooms1 617 sqft
3 bedrooms with a private pool3 142 sqft
4 bedrooms with a private pool3 542–3 551 sqft
Handover
September 2029
Developer
Tomorrow World
Figures come from the developer's own materials sent to brokers, dated 15 October 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Dubai Islands, currently under construction. Developer — Tomorrow World.
What the building has
Swimming pool
Gym
Children's area
Sports courts
Specifications for The Bay Interiors by Missoni as published by the developer — the project is under construction, so there is no Land Department record yet.
They describe the whole building, not the individual unit.
About the project
The Bay Interiors by Missoni is a residential building in Dubai Islands, handover is due Q3 2029.
The developer is Tomorrow World.
The building holds 132 apartments in total. Layouts, according to the sales-launch announcement — 2, 3 and 4 bedrooms.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
What the complex has
Swimming pool
Gym
Children's area
Sports courts
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
Listings for The Bay Interiors by Missoni do not turn up every day. Message me — I will check the closed bases and suggest similar options nearby, in Dubai Islands.
The final payment on this building falls in 2029 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
Frequently asked about The Bay Interiors by Missoni
Who is the developer of The Bay Interiors by Missoni?
Tomorrow World.
When is The Bay Interiors by Missoni handed over?
The sales-launch announcement says Q3 2029. The date in the contract for a particular unit can differ — I check it before the deal.
What layouts are there in The Bay Interiors by Missoni?
2-bedroom, 3-bedroom and 4-bedroom, according to the sales-launch announcement. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Where is The Bay Interiors by Missoni?
Dubai Islands. The reclaimed islands off Deira, formerly Deira Islands: beaches, hotels and new residential on the northern coast.
How much does an apartment in The Bay Interiors by Missoni cost?
Our database has no open listings for The Bay Interiors by Missoni at the moment. I will check the price of the layout you want against the closed databases and send it together with the deal costs.
What is on site at The Bay Interiors by Missoni?
Swimming pool, Gym, Children's area, Sports courts. The list comes from the project description and covers the whole complex.
Nakheel has released Bay Estate, the first community on Island E of Dubai Islands: 357 townhouses and villas plus 60 plots around two swimmable lagoons. A three-bedroom townhouse averages AED 5.9m; handover is estimated for January 2031.
A 1 425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16 000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
CG Developers is building Dubai's first JW Marriott residence, priced from AED 1.72 million with a Q1 2028 handover. In parallel, Nakheel has awarded a AED 527 million contract for Island B's core infrastructure — roads, water and sewage for a future 49 000 homes.
A chain of reclaimed islands under a single government master plan. Almost no coastal land with direct beach access is left inside the emirate — and one or two new projects launch here every month. The opportunity and the risk are the same fact.
A developer building on the Dubai Islands. Between handover and the first tenant there is a list of connections and registrations, and every one of them needs someone on the ground.
A developer building on the Dubai Islands. The dirham’s peg to the dollar shapes the currency risk for every foreign buyer — and the transfer mechanics have costs of their own.
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.
A developer with two projects on the Dubai Islands. Beach access is sold as a feature and defined as a legal arrangement — and the two are not always the same thing.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.