Mr. Eight Development: an off-plan villa on an island still being made
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.
DubaiLand Residence Complex · Mr. Eight Development
Photos and renders of the building and grounds — not of this particular unit.
Layouts and the handover date come from the developer's brochure in our archive. Prices and payment plans from the same source are deliberately not published: they are dated to when the brochure was issued and do not match today's prices. I will send the current ones over WhatsApp.
A residential building in DubaiLand Residence Complex, currently under construction. Developer — Mr. Eight Development.
Specifications for The WOW Tower per Propsearch and the Dubai Land Department. They describe the whole building, not the individual unit.
The WOW Tower is a residential building in DubaiLand Residence Complex, handover is due Q3 2029.
The developer is Mr. Eight Development.
The database currently holds 1 lot in this project, from 2 076 000 AED; 1 of them priced below the market, the deepest discount 7%.
A 44-storey tower in Dubailand Residence Complex with offices whose interiors are designed by British designer Tom Dixon. Entry from $193,000, handover stated for Q3 2029.
Studios from 35 m² are priced from $193,000, one-bedrooms from 62 m² from $295,000, two-bedrooms from 113 m² from $513,000. Offices are priced separately: from 94 m² and $551,000.
Doing the math reveals a gap: around $5,500/m² for a studio, around $4,500/m² for a two-bedroom, and around $5,900/m² for an office. In other words, office space here is the most expensive per square metre, and it only makes sense to buy it for a specific rental scenario, not just to have one.
The service charge is stated at $53/m² a year — higher than at neighbouring projects, which is explainable: a 44-storey tower with its elevator systems and lobby costs more to run than a low-rise building. For a 35 m² studio that's around $1,900 a year.
Payment plan: an application deposit of $19,000, then 20% on booking, 30% during construction, and 50% on handover. Half the price due at handover is a serious load, and it's worth planning for from the start.
The equestrian club is stated at ten minutes, and Global Village, GEMS schools, a theme park, and a shopping mall at around fifteen. A station on the metro's blue line is planned for the district.
Inside: a pool, lounges, a fitness centre, shops and cafes, a children's play area. Interiors are done in a beige palette, and the offices are stated to have their own terraces.
Sales-launch materials from the selling side: floor areas, prices, service charge, payment plan, and handover date. Price per square metre by unit type is our own calculation.
That is the share of every off-plan deal in the emirate for the month that went to Dubailand Residence Complex — out of 9 475 registrations. For scale: off-plan accounts for 72.8% of the market as a whole, so the bulk of the city's turnover runs through construction rather than through finished homes.
🔴 This is a figure for the location, not for this building. A cluster holds dozens of towers with different handover dates and prices, and a high share means there is a lot of supply here and a lot of deals — not that this particular tower sells better than its neighbour. On a resale that cuts both ways: liquidity is higher, but so is the number of flats competing with yours.
Monthly ValuStrat market review for July 2026, checked 24 August 2026.
The pin is placed by district — I send the exact address on request.
The final payment on this building falls in 2029 — under off-plan plans that is 40–60% of the price in one go. A UAE bank closes it: the flat becomes the security, and nothing is added on top of what the developer has already been paid.
Already been invoiced, or missed the date? That is not a dead end either — write and we will look at what the developer will accept.
Ask on WhatsAppMr. Eight Development.
The developer's brochure says Q3 2029. The date in the contract for a particular unit can differ — I check it before the deal.
Dubailand Residence Complex. Dubailand Residence Complex (DLRC) is the affordable apartment and townhouse district on the eastern side of Dubailand, by Emirates Road and the Dubai–Al Ain highway.
The database currently holds 1 lot in this project, from 2 076 000 AED; 1 of them priced below the market, the deepest discount 7%. Prices move every day, so it is worth asking for the current list for this building.
What has been written about the building, its developer and DubaiLand Residence Complex
A developer building villas on the Dubai Islands. A house bought off-plan on new land combines two kinds of waiting, and they resolve on different timetables.
I will send the available layouts, the real entry price and what owners and tenants actually say about the building — without the brochure language.
Telegram is the fastest way — I answer personally.
Message on Telegram