Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
Developer prices
These are the starting prices as of the date shown, not today's list: off-plan
they are revised several times a year, and more often upwards than down.
2 bedrooms — 2 lots
from AED 1 881 000 1 174–1 270 sqftas of 3 November 2026
Payment plan
60/40
Handover
October 2026
Developer
Imtiaz Developments
Figures come from the developer's own materials sent to brokers, dated 3 November 2026. The commentary behind them is written up in the Russian
version of this page.
About the building
A residential building in Dubailand, currently under construction. Developer — Imtiaz Developments.
About the project
Cove Edition 2 by Imtiaz is a residential building in Dubailand, handover is due Q4 2026.
The developer is Imtiaz Developments.
Layouts, according to the developer's brochure — 1 and 2 bedrooms.
The database has nothing for this project at the moment: lots come and go here, and it refreshes nightly.
An Imtiaz building in Dubailand due in October 2026: four units remain with the developer, and it's the cheapest entry on its August list.
What it is
Cove Edition 2 by Imtiaz is an Imtiaz Developments residential building in Dubailand, under construction, with handover in October 2026 per the developer's list. Payment plan 60/40; brochure layouts are 1 and 2 bedrooms. Storeys and unit count aren't given.
Per the availability list of 28 August 2026, four units remain: two one-bedrooms at AED 1,344,526 for 742–745 ft² and two two-bedrooms at AED 1,881,000 for 1,174–1,270 ft². Within each pair the price is the same despite different sizes — you pay for the type, not the square footage.
Nearly finished
It's the cheapest entry on Imtiaz's entire August list: one-bedrooms in the developer's other buildings start from AED 1.9 million and up.
With handover in October, a 60/40 plan means most of the payment is due on keys within weeks — be ready for it, including with a mortgage.
One lot is linked to the project in our database — a studio at AED 584,000. The brochure has no studios, so the format and whether the lot belongs to this building need checking.
For context: Dubailand in our database has 113 lots, median AED 4.5 million, AED 1,469/ft²; the figures mix townhouses and apartments.
Propsearch passport: developer Imtiaz Developments, status "under construction", Dubailand. Imtiaz availability list as of 28 August 2026: four units, prices, sizes, payment plan and handover. Our stock as of 21 September 2026: one lot in the project; Dubailand median and price per square foot.
Where it is
The pin is placed by district — I send the exact address on request.
Nothing in the stock for this project right now
The stock refreshes every night, and lots here appear and go. Message me — I will check the closed bases and suggest the nearest alternatives in Dubailand.
The final payment on this building falls in 2026 — under off-plan plans that is
40–60% of the price in one go. A UAE bank closes it: the flat becomes the security,
and nothing is added on top of what the developer has already been paid.
Up to 80% of the appraised value, no extra down payment
3.99% fixed for three years, up to 25 years in term
6–12 months before the keys — the bank wants six months of income history
Already been invoiced, or missed the date? That is not a dead end either — write and
we will look at what the developer will accept.
The developer's brochure says Q4 2026. The date in the contract for a particular unit can differ — I check it before the deal.
What layouts are there in Cove Edition 2 by Imtiaz?
1-bedroom and 2-bedroom, according to the developer's brochure. Which sizes are actually free right now depends on what is on the market; I will send the current list.
Where is Cove Edition 2 by Imtiaz?
Dubailand. Not one district but a vast planned region covering much of inland Dubai — a name that means very little without a sub-community attached.
How much does an apartment in Cove Edition 2 by Imtiaz cost?
Our database has no open listings for Cove Edition 2 by Imtiaz at the moment. I will check the price of the layout you want against the closed databases and send it together with the deal costs.
A mid-market company that went from a handful of projects to a large pipeline in a few years. What rapid growth does to risk, and the specific evidence that separates a good scaler from a stretched one.
Lyra is a roughly 20-storey tower of 349 apartments in Majid Al Futtaim’s forest community, Ghaf Woods. Registered with the Dubai Land Department on 26 October 2026, it starts at about AED 1.19m for a one-bedroom on a 50/50 plan.
Imtiaz has launched Kore, a 17-storey residential building in DLRC: 406 sq ft studios from AED 679,000, one-bedrooms from AED 1.1m, 1,406 sq ft two-bedrooms from AED 1.55m. Handover in Q4 2028, on a 50/50 or 60/40 post-handover plan.
In October 2024 UK-founded LEOS moved its global headquarters to Dubai and announced a $7bn fund for 10+ UAE projects. A year later it launched LEOS Royal with Dubai Holding: about 800 villas and townhouses in Wadi Al Safa 5, valued at AED 5bn+. How to read a developer like this.
Dubai Land Residence Complex spent years being what agents delicately call “out of town”. The pattern that repeated twice before says what a station does next.
A mid-market developer building a lagoon-themed project in Dubailand. Water features are the current standard amenity — here is what they actually add and what they take every year.
A development shaped like a falcon, with quarters themed on world landmarks. Long-running master plans have a particular risk profile, and it is not the one buyers usually expect.
A developer building a villa community in Dubailand. Villa pricing splits into plot and structure, and the two behave completely differently over time.
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.