Layouts and the handover date come from the developer's brochure in our archive.
Prices and payment plans from the same source are deliberately not published:
they are dated to when the brochure was issued and do not match today's prices.
I will send the current ones over WhatsApp.
Developer prices
The developer's last quote in our materials is dated 23 February 2026,
which is more than 6 months old, so the sums are not shown
here. I will send the current price list and availability over WhatsApp.
Payment plan
50/50, AED 100 000 EOI
Developer
Beyond Developments
Figures come from the developer's own materials sent to brokers, dated 23 February 2026. The commentary behind them is written up in the Russian
version of this page.
About the project
Le Château at Evermore is a residential complex in Al Marjan Island.
Layouts, according to the developer's brochure — 1, 2 and 3 bedrooms.
No lots from this project are in our database today. It is topped up every night, so listings for the building can turn up on any day.
Le Château is the first tower of Beyond's EVERMORE community on Al Marjan Island; our stock has three lots from AED 2.16 million, all below market.
What it is
Le Château at Evermore is a Beyond Developments residential complex on Al Marjan Island in Ras Al Khaimah. Layouts per the brochure: one, two and three bedrooms; payment plan 50/50.
The developer presents it as the first tower of the EVERMORE community: beachfront, 600 metres of private shoreline and a direct view of the future Wynn casino. These are promises from the announcement, not facts we have verified.
At the time of the announcement, 23 February 2026, Beyond was collecting EOIs of AED 100,000 — an application to take part in the launch, not a reservation of a specific unit.
Three lots in our stock
One-bedroom: AED 2,157,000 for 835 ft², 4% discount.
Two-bedroom: AED 3,286,000 for 1,246 ft², 16% discount — the deepest of the three.
Three-bedroom: AED 4,663,000 for 1,665 ft², 9% discount. All three are below market, but these are resales of rights in a building under construction, not ready homes.
Beyond Developments announcement to brokers dated 23 February 2026 (50/50 plan, EOI, positioning); brochure: layouts. Our stock as of 21 September 2026: 3 lots in the project (prices, sizes, discounts).
Nothing in the stock for this project right now
Lots for this project come and go, and the stock is topped up nightly. Message me — I will look through the closed bases and find the closest alternatives in Al Marjan Island.
1-bedroom, 2-bedroom and 3-bedroom, according to the developer's brochure. Which sizes are actually free right now depends on what is on the market; I will send the current list.
How much does an apartment in Le Château at Evermore cost?
No open lots for the building today. I will check the price of the layout you are after in the closed databases and send it with every cost of the deal worked out.
Three emirates, three jobs. Dubai: 3.8 million people, liquidity and an exit in weeks. Abu Dhabi: freehold only in investment zones, living costs about 12% lower. Ras Al Khaimah: 64 km of beaches and a $5.7bn Wynn resort due in September 2027.
A Property Finder study puts the UAE’s top residential deal of 2026 at AED 200m for a villa in Al Shamkha, Abu Dhabi. Dubai’s ceiling is an AED 170m Palm Jumeirah villa and an AED 147m Jumeirah plot. In Ras Al Khaimah an Al Marjan apartment sold for AED 34m.
Knight Frank counts 175 branded residence schemes in Dubai: 68 live and 107 in the pipeline. Miami has 73, London 30. Abu Dhabi has 24 and Al Marjan Island 23. The UAE holds 19% of the global pipeline.
Wynn Al Marjan Island has unveiled its two largest suites, the Mayfair Apartment and the Paris Apartment, each about 1 460 sq m with seven bedrooms on the top floors of its 70-storey tower. They are hotel suites, not homes for sale. What they signal for Al Marjan property.
Ras Al Khaimah targets 3.5m visitors a year by 2030 (1.35m in 2025), wants to grow hotel stock from 8 700 to about 16 000 keys with 80% premium, and is building a terminal for 3m passengers by 2028. What it means for property buyers.
Wynn Al Marjan Island now opens in September 2027 instead of Q1, and the budget is up $600m to about $5.7bn. Licence granted by the GCGRA in October 2024, $2.4bn construction loan closed in February 2025. What the delay means for Al Marjan investors.
RAK Properties closed 2024 with revenue of AED 1.41bn (+40%) and net profit of AED 280.9m (+39%), but withheld its dividend to speed up construction ahead of the $5.1bn Wynn Al Marjan Island resort, now targeting a September 2027 opening. What it means for buyers on Al Marjan Island.
Ras Al Khaimah is building its own vertiport by Al Marjan Island, Uber and WeRide are already carrying driverless passengers in Jumeirah, and Abu Dhabi has signed on for electric Seaglider service. Status as of September 2026 on all three.
Ardee has poured foundations for its AED 2bn Fairmont Residences, while Richmind's Oystra — with a curved steel truss designed by Zaha Hadid Architects — sold out its first phase and launched a second. Here is what is actually under construction on the island next to the Wynn resort.
I will tell you which layouts are available now, what entry really costs and what the people who live in or let the building think of it — no marketing language.