Future transport in the UAE, 2026: Ras Al Khaimah's vertiport, Uber robotaxis and sea gliders
Ras Al Khaimah is building its own vertiport by Al Marjan Island, Uber and WeRide are already carrying driverless passengers in Jumeirah, and Abu Dhabi has signed on for electric Seaglider service. Status as of September 2026 on all three.
We have already covered how air taxis are launching between Dubai and Abu Dhabi. But more transport projects have reshaped how people will move around the UAE over the past year than just the DXB–Palm route: Ras Al Khaimah is building its own vertiport, driverless cars are already on Dubai's roads, and Abu Dhabi is preparing a genuinely new transport mode — over water, but not flying in the conventional sense.
Ras Al Khaimah's vertiport: 15 minutes to Al Marjan instead of an hour and a half
The Ras Al Khaimah Transport Authority (RAKTA), together with Joby Aviation and operator Skyports, has agreed to launch an air-taxi network across the emirate by 2027. The first vertiport will sit on Al Marjan Island, timed to the opening of the Wynn Al Marjan Island resort, currently targeted for Q1 2027. A flight from Dubai International Airport (DXB) to the island is projected at around 15 minutes, versus over an hour by car; Joby's aircraft carries a pilot and up to four passengers at speeds up to 321 km/h. A second site is planned for Jebel Jais, the UAE's highest peak, eventually linking into routes already launching in Dubai.
Uber and WeRide robotaxis: already carrying fare-paying passengers
On 31 March 2026, Uber and China's WeRide officially launched fully driverless, fare-charging robotaxi operations in Dubai — no safety driver behind the wheel, booked through the regular Uber app via an "Autonomous" option. Commercial routes currently run in Jumeirah and Umm Suqeim, two coastal tourist districts. In February 2026, the RTA granted WeRide a permit to trial driverless vehicles across a wider set of zones, including Dubai Silicon Oasis, Dubai Investment Park Second and Jabal Ali Industrial First, plus suburban Nad Al Sheba, Wadi Al Safa, Warsan and Ras Al Khor. That same month, Uber and WeRide announced plans to deploy at least 1,200 robotaxis across the region — Dubai, Abu Dhabi and Riyadh.
Talk to a licensed broker: 📲 +971 50 120 32 64 on WhatsApp, @dubai_oleg on Telegram
Seaglider in Abu Dhabi: electric transport skimming the water by 2028
Abu Dhabi's Department of Culture and Tourism, the Abu Dhabi Investment Office, the Integrated Transport Centre (Abu Dhabi Mobility) and operator VERSA have signed an agreement to roll out electric Seaglider craft across the emirate by 2028. The vehicle takes off from the water on hydrofoils, then flies low above the surface at speeds up to 290 km/h, using existing dock infrastructure with no new ports required. The first route will connect Abu Dhabi City with the Al Dhafra region; a future Abu Dhabi–Dubai line is also under consideration, projected at under half an hour for AED 200–250 — a fraction of a helicopter's cost and comparable to a premium taxi.
What it means for the property market
All three projects work on the same variable: effective distance. The vertiport makes Al Marjan Island logistically closer to Dubai than to the mainland of its own emirate; robotaxis cut the cost of the last mile where public transport does not reach; Seaglider promises to erase the "Abu Dhabi or Dubai" line from an investment decision almost literally. None of the three is running at full scale yet, and pricing it into a property today would be premature — but ignoring it when choosing a location on a 2027–2028 horizon no longer makes sense.
For the island the vertiport is being built around, see our piece on the UAE's first casino on Al Marjan Island.
Video on this topic
The same subject on the English channel — each clip has a written version of its own.
15:43Nobu in Ras Al Khaimah and Abu Dhabi: why the RAK one is the more interesting asset10 December 2023
19:45Oceano on Al Marjan Island: the Luxe Developers project and the island being built around it14 August 2026
13:37Al Marjan Island plots: what the branded launches in Ras Al Khaimah are actually built on10 December 2023
15:37Abu Dhabi property investment: Saadiyat Island and the Aldar launch numbers16 February 2023
In the news
Other write-ups on the site about the same thing.
Ras Al Khaimah to 2030: 3.5m visitors, 16,000 hotel keys and a new airport terminal
Ras Al Khaimah targets 3.5m visitors a year by 2030 (1.35m in 2025), wants to grow hotel stock from 8,700 to about 16,000 keys with 80% premium, and is building a terminal for 3m passengers by 2028. What it means for property buyers.
Wynn Al Marjan Island: opening moves to September 2027 as budget rises to about $5.7bn
Wynn Al Marjan Island now opens in September 2027 instead of Q1, and the budget is up $600m to about $5.7bn. Licence granted by the GCGRA in October 2024, $2.4bn construction loan closed in February 2025. What the delay means for Al Marjan investors.
RAK Properties: Ras Al Khaimah's biggest developer grew revenue 40% in 2024 — and skipped its dividend to build faster
RAK Properties closed 2024 with revenue of AED 1.41bn (+40%) and net profit of AED 280.9m (+39%), but withheld its dividend to speed up construction ahead of the $5.1bn Wynn Al Marjan Island resort, now targeting a September 2027 opening. What it means for buyers on Al Marjan Island.
Al Marjan Island: Fairmont Residences by Ardee, and Oystra by Zaha Hadid
Ardee has poured foundations for its AED 2bn Fairmont Residences, while Richmind's Oystra — with a curved steel truss designed by Zaha Hadid Architects — sold out its first phase and launched a second. Here is what is actually under construction on the island next to the Wynn resort.
Al Marjan Island branded residences: W, Jacob & Co and Sheraton next to Wynn, delivering 2027–2028
Wynn Al Marjan opens in September 2027, and branded homes around it deliver in the same window: W Residences from AED 1m, Jacob & Co Residences (223 units, AED 300m sold in 12 hours), 141 Sheraton residences and Park Beach Residences 2. Where the risk sits.
UAE Golden Visa through property in 2026: mortgages, off-plan and how Dubai, Abu Dhabi and RAK differ
The threshold is AED 2m everywhere, but it is not measured the same way. Since January 2024 Dubai counts a mortgaged home at its full DLD valuation; Abu Dhabi wants AED 2m of your own equity. Mortgages, off-plan, three emirates and what the visa gives beyond residence.





