RTA's Latifa Bint Hamdan Corridor: 12km of New Road for AED 2 Billion
A new artery will directly link six highways and halve the drive from Umm Al Sheif to Emirates Road. Who it affects: Nad Al Sheba, Al Barari, Dubai Hills, Majan, Living Legends.
On 12 July 2026, Dubai's RTA revealed details of the Latifa Bint Hamdan Corridor — one of the largest road projects of the next few years. Investment: AED 2 billion. Length: 12 kilometres.
What's being built
The corridor directly links Sheikh Zayed Road, Al Khail Road, Al Meydan Street, Sheikh Mohammed bin Zayed Road, Sheikh Zayed bin Hamdan Al Nahyan Street and Emirates Road. The scope includes seven bridges spanning 2.3 kilometres in total, eight tunnels, and widening the carriageway to four lanes in each direction.
Projected capacity is up to 16,000 vehicles an hour in both directions, over 130,000 trips a day. RTA estimates the entire east–west road network in this part of the city will handle traffic roughly 12% better as a result. The plan also adds 12.5 kilometres of cycle lanes, extending the existing network from Al Qudra to Jumeirah.
Talk to a licensed broker: 📲 +971 50 120 32 64 on WhatsApp, @dubai_oleg on Telegram
Who it affects
Primarily residents of Nad Al Sheba, Al Barari, Dubai Hills, District One, Mohammed Bin Rashid Gardens, Living Legends, Majan and Global Village — essentially everything along Al Meydan Street between Al Khail Road and Emirates Road.
The single most measurable figure: travel time from Umm Al Sheif Street to Emirates Road drops from 33 to 15 minutes. Completion is planned for the end of 2028.
What it means for prices
Transport access is one of the few factors that lifts prices predictably across an entire district at once, rather than for a single building. For car-dependent areas with no metro access — which is exactly the case for Majan, Living Legends and part of Nad Al Sheba — the road itself is the infrastructure that changes their standing.
One caveat on timing: the effect lands on completion, not on the announcement. Until the end of 2028, residents of these areas will also be living with construction outside their windows.
Video on this topic
The same subject on the English channel — each clip has a written version of its own.
ShortDubai 2040: the masterplan that tells you where demand goes next28 August 2025
ShortFour cities, four bets on the future: Dubai, New York, London, Tokyo4 September 2025
ShortThe Jebel Ali coast: Dubai's last big stretch of undeveloped shoreline2 September 2025
ShortAir taxis in Dubai: what eVTOL would change, and what it would not1 September 2025
ShortDubai is learning to walk: the 20-minute city and what it does to rent27 August 2025
ShortThe world's largest solar park, and why a property buyer should care25 August 2025
In the news
Other write-ups on the site about the same thing.
Dubai Islands to Bur Dubai bridge: 1.4 km, eight lanes and a late-2026 opening
A 1,425 m bridge across Dubai Creek will link Dubai Islands directly to Bur Dubai: four lanes each way, 16,000 vehicles an hour, 18.5 m above the water. The AED 786m contract targets completion by the end of 2026. What the bridge changes for the islands and the old city.
JVC traffic fix: RTA and Dubai Holding’s AED 6bn road programme and four new access points
The RTA and Dubai Holding signed an AED 6bn (about $1.6bn) road programme: four new JVC access points with interchanges, double the capacity and 70% shorter journeys. Hessa Street phase two adds a 780 m bridge and a 480 m tunnel out of JVC. What it means for owners and buyers.
Hessa Street rebuild finished: what the AED 690m upgrade means for JVC, Al Barsha and Arjan
RTA fully opened phase one of the Hessa Street upgrade in April 2026: 4.5km, four lanes each way, capacity up from 8,000 to 16,000 vehicles an hour, and the Sheikh Zayed Road–Al Khail Road run cut from 15 minutes to about 4.
Direct Access to Dubai Islands: RTA Signs AED 786 Million Road Contract
Dubai’s Roads and Transport Authority has signed a contract to build a direct entry and exit to Island A of the Dubai Islands archipelago from the Bur Dubai side. Here’s what it changes for buyers on the islands.
Dubai Airport Express Line via JVC and the Abu Dhabi high-speed train: what changes for property
The RTA is planning a 55 km, five-station Airport Express Line from DXB via Al Jaddaf and Al Khail Road to JVC and Al Maktoum, with flight check-in at the stations. Etihad Rail is separately building a 350 km/h Abu Dhabi–Dubai line with a 30-minute journey. What it means for JVC and Al Jaddaf.
Dubai Loop: Elon Musk’s tunnel between DIFC and Dubai Mall — what is really being built
The Boring Company’s Dubai Loop: a 6.4 km pilot with 4 stations between DIFC and Dubai Mall for about $154m, a full 22.5 km, 19-station network for about $545m. The RTA contract was signed in February 2026 and tunnelling is due in the second half of the year. What it means for buyers downtown.





