Skip to content

Sell your apartment in Dubai

Leave your name and phone number — I will get back to you to discuss price and timing.

How I sell apartments →

Upside

Business Bay · SRG Holding Ltd

Project factsheet

Storeys 29
Developer SRG Holding Ltd
Status Completed
Completed 2023
District Business Bay

About the building

29-storey hotel residence in Business Bay, completed in 2023. Developer — SRG Holding Ltd. Architect — ERGA Progress Engineering Consultants.

About the project

Upside is a 29-storey hotel residence in Business Bay, completed in 2023.

The developer is SRG Holding Ltd. The architecture is by ERGA Progress Engineering Consultants.

The database currently holds 1 lot in this project, from 1 800 000 AED.

SRG's furnished apartments in Business Bay: launch pricing in the brochure from AED 960,888 (~$260K), with a payment plan that continues after handover.

What's claimed

UPSIDE is a building in Business Bay by SRG Holding. Per the developer's brochure, apartments are delivered fully furnished, the starting price is listed as AED 960,888 with an asterisk, and a payment plan with instalments after handover is on offer.

The brochure positions this not as "an apartment to live in" but as serviced housing with shared spaces: co-working, lounges, common areas for residents. The furnishing here isn't a bonus — it's part of the product, built for monthly and short-term letting.

Commute times — and a discrepancy within the brochure itself

The document contains two distance lists, and they don't agree with each other. The first: Dubai Mall — 5 minutes, the metro — 7, DIFC — 8, Burj Khalifa — 8. The second, on a neighbouring page: Dubai Mall — 10 minutes, Burj Khalifa — 10, DIFC — 15, World Trade Centre — 15, DXB airport — 11, Museum of the Future — 12, Meydan — 15, Ras Al Khor — 9, Mall of the Emirates — 25, Burj Al Arab — 30, Alserkal Avenue — 20.

This isn't nitpicking: the difference between "8 minutes to DIFC" and "15 minutes to DIFC" is double. Go by the larger figure, or better, check the route yourself at rush hour.

Finishes and design

Upside is a 29-storey building in central Business Bay. In summer 2023 studios started from USD 277,000. Kitchens are fitted with SMEG appliances and bathrooms with Italian tiles.

The co-living interiors were designed by Rania Hamed, named by AD Middle East among the UAE's notable designers, whose work blends the traditional and the contemporary with Japanese influences.

Starting price, furnishing, the post-handover payment plan, and both distance lists — the developer's project brochure. Height, launch price and specification — round-up of homes under USD 300,000, August 2023; interior designer — AD Middle East list of UAE designers, March 2024.

Registered sales in the building

In 2025 the Dubai Land Department registered 107 sales in Upside, at a median price of AED 1 486 317 (AED 2 925 per sq ft). Another 39 have been registered since the start of 2026.

Sales by year — Dubai Land Department register
Year Sales Median price AED/sqft Total value
2025 107 AED 1 486 317 2 925 AED 152m
2026, to 10 November 39 AED 1 642 888 3 185 AED 50.1m

Registered sales of all property types; 2026 is a partial year. Medians, not averages; with fewer than 5 sales no price is quoted. Off-plan share of sales over the last 12 months: 0%.

Rents across the Business Bay community — not this building alone
Type Annual rent Contracts Gross yield
Studios AED 65 000 4 208 6.4%
1-bedroom AED 85 000 6 959 5.9%
2-bedroom AED 129 000 3 121 5.7%
3-bedroom AED 189 999 743 5.7%
4-bedroom AED 300 000 84 5.6%

Median Ejari contract (November 2025 — October 2026) across the whole community rather than this building: rents are not published building by building. Gross yield — before service charges, vacancy and fees.

Price per sq ft by month

Between November 2024 and July 2026 the median price per sq ft moved from AED 3 223 to AED 3 190 (−1%).

3 619 2 589 November 2024: 3 223 AED/sqft December 2024: 3 124 AED/sqft February 2025: 3 085 AED/sqft March 2025: 2 926 AED/sqft May 2025: 2 589 AED/sqft June 2025: 2 624 AED/sqft July 2025: 2 851 AED/sqft August 2025: 2 765 AED/sqft September 2025: 3 198 AED/sqft October 2025: 3 088 AED/sqft November 2025: 2 791 AED/sqft December 2025: 2 672 AED/sqft January 2026: 3 262 AED/sqft February 2026: 3 050 AED/sqft June 2026: 3 619 AED/sqft July 2026: 3 190 AED/sqft November 2024 July 2026

Monthly median of registered sales, ready and off-plan together; months with fewer than five sales are left out.

Latest registered sales
Date Unit Status Size, sq ft Price AED/sqft
09/10/2026 Apartment, studio ready 471 AED 1 250 000 2 656
01/09/2026 Apartment, studio ready 378 AED 1 150 000 3 042
27/07/2026 Apartment, studio ready 507 AED 27 689 55
24/07/2026 Apartment, studio ready 472 AED 14 089 30
24/07/2026 Apartment, studio ready 507 AED 4 729 9
24/07/2026 Apartment, studio ready 472 AED 26 128 55
23/07/2026 Apartment, studio ready 474 AED 1 712 888 3 617
23/07/2026 Apartment, studio ready 578 AED 1 846 888 3 196
23/07/2026 Apartment, studio ready 564 AED 1 642 888 2 914
23/07/2026 Apartment, studio ready 474 AED 1 507 888 3 185
22/07/2026 Apartment, studio ready 474 AED 1 712 888 3 617
22/07/2026 Apartment, studio ready 512 AED 1 486 888 2 901

Buyer, seller and unit number are not part of the Land Department open data.

Source: Dubai Data (calculated from Dubai Land Department open data), data to 10 November 2026.

How it looks today

Our own photographs of the finished development: the gym, the pools, the terraces, the playground, a kitchen and the views from the balconies. The renders above are what the developer drew — comparing the promise with the result beats looking at either one alone.

Where it is

Frequently asked about Upside

Who is the developer of Upside?

SRG Holding Ltd. The architecture is by ERGA Progress Engineering Consultants.

How many floors does Upside have?

29.

Has Upside been handed over?

Yes, the building was handed over in 2023. This is ready housing: you can move in or let it out right after the deal.

Where is Upside?

Business Bay. The canal district next to Downtown: conceived as offices, built mostly as apartments, now one of the most tenanted parts of the city.

How much does an apartment in Upside cost?

The database currently holds 1 lot in this project, from 1 800 000 AED. Prices move every day, so it is worth asking for the current list for this building.

In the news

What has been written about the building, its developer and Business Bay

Where this project stands today

Message me for the free layouts in Upside, the real entry price and what owners and tenants say — not the brochure copy.

Ask a question

Telegram is the fastest way — I answer personally.

Message on Telegram